TRANSMISSION TOWER MJM56, MURUM JUNCTION ROAD
ENGINEERING REMEDIAL WORKS TO SLOPE AT TRANSMISSION TOWER MJM56, MURUM JUNCTION ROAD
Type of Services
Soil Nailing & Slope Protection Works
Location
Sarawak, Malaysia
Duration
Oct 2017 – Aug 2018
ENGINEERING REMEDIAL WORKS TO SLOPE AT TRANSMISSION TOWER MJM56, MURUM JUNCTION ROAD
Soil Nailing & Slope Protection Works
Sarawak, Malaysia
Oct 2017 – Aug 2018